Master Plan do Porto de Cabinda

The intervention carried out in the Cabinda Harbour included the preparation of the master plan for 148 hectares of the area under the jurisdiction of the Port, as well as the survey and layout of all existing infrastructure, buildings and other operational areas.

The Planned Intervention included the incorporation of several existing projects, as well as details of further action to be undertaken in the short, medium and long term to ensure the economic and operational sustainability of the Cabinda Harbour, increasing the potential traffic of goods and merchandise but also of passengers through the introduction of a new departure terminal.

client
Empresa Portuária de Cabinda

location
Cabinda, Angola

project
2011

phase
Em construção

intervention area
148ha